Here is this final product - a Sunny Boy inverter and 16 230W Sharp panels. Installation took only 1 1/2 days. It's all ready to go, just waiting on the utility to swap out the meter and for the city inspector.
Although it doesn't appear like it, I really do have a day job. I'm a hardware guy (which explains why my coding is so bad!) I've been designing chips for a living since 1993.
No comments:
Post a Comment